Planning

    loi Littoral and PADDUC: what can be built in Corsica

    9 min read Updated on 1 July 2026

    A plot advertised as having a “sea view and planning certificate (CU)” cannot necessarily be built on. With the loi Littoral, PADDUC and local development plans (PLUs) all involved, development potential in Corsica must be checked against the documents. This guide covers the essentials to avoid buying land you cannot build on.

    The essentials

    • Construction prohibited in principle within the 100-metre coastal strip outside developed areas.
    • Development must be contiguous with existing built-up areas.
    • The outstanding landscape areas designated by the PADDUC are strictly protected.
    • A project-specific planning certificate is the only reliable document before buying.

    The key principles of the loi Littoral, France's coastal planning law

    The loi Littoral coastal planning law regulates development in coastal communes. Three rules account for most disputes: the ban on building within the 100-metre coastal strip outside existing built-up areas, limited development in areas close to the shore, and the requirement to build contiguously with existing built-up areas and villages.

    In practice, an isolated plot in the middle of the maquis scrubland, even with road access, is very unlikely to be eligible for building, whatever its size.

    The PADDUC, a framework specific to Corsica

    Corsica's sustainable planning and development plan identifies, among other things, strategic agricultural areas and outstanding or distinctive landscape areas. These designations are binding on municipal local development plans (PLUs) and can prevent building for the long term.

    The same hamlet can therefore contain both plots that can be built on and others permanently barred from development, with no visible difference on the ground.

    Checks to carry out before buying

    Before making any offer on land or a property you intend to extend, always gather the documents that establish building rights. This stage takes two to three months: it must begin before signing, not afterwards.

    • Project-specific planning certificate confirming the project's feasibility
    • Extract from the local development plan (PLU) and zoning regulations
    • Checking PADDUC zoning (strategic agricultural areas, outstanding protected areas)
    • Drainage assessment and utility connections (water, electricity)
    • Easements, boundary demarcation and legally secured access

    What can you do with land that cannot be built on?

    Land that cannot be built on retains value for its use and agricultural potential, but its price per m² is nothing like that of a building plot. Some changes to the local development plan (PLU) may reclassify a plot, but speculating on a future revision is a gamble, never a strategy.

    If you already own land of this kind, a legally supportable valuation provides an objective assessment of its true value, particularly when dividing an inherited estate.

    Frequently asked questions

    Outside already developed areas, construction is prohibited there. Exceptions are rare and concern activities requiring immediate proximity to the water.

    The project-specific planning certificate fixes the applicable rules for 18 months and indicates whether the project is feasible, but it does not replace the assessment of a planning application.

    By consulting the PADDUC zoning and the commune's PLU (local development plan) at the town hall, or by requesting a planning certificate listing the applicable easements.

    Rebuilding a ruined building requires proof of its lawful existence and its former physical extent. Without this, it is treated as a new build, with all the associated restrictions.